+353 42 9662281
  • Home
  • What we do
    • Piling
      • Odex Piling
      • Top Driven Piling
      • Low Vibration Piling
      • Mini Piling
      • Underpinning
      • Sheet Piling
      • Rock Anchors
      • Soil Nailing
      • Grouting
      • Bridge Grouting
      • Pile Testing
      • Screw Piling
    • Directional Drilling
    • Pipe Ramming
    • Moling
    • Utilities
      • Water Meters Installation
      • Water Mains Installation
      • Water Leak Repairs
      • Sewer
      • Urban Renewal
      • Civil Engineering
  • Recent Jobs
  • Machinery for hire or sale
  • About Us
  • Contact Us

Bridge Of Peace Drogheda

April 11, 2015
by aideenadmin
Barriers
0 Comment

Works commenced on the 20th of January 2015

High containment kerbs were installed to try & prevent any HGV(s) mounting the pedestrian footpath. Along with this were some Luna rail & Posts installed on top of the high containment kerbs, both as a safety feature to the public and as an aesthetically pleasing piece of street furniture.

Bridge of Peace
Bridge of Peace
Bridge of Peace
Bridge of Peace (Finished)
Bridge of Peace (Finished)
Bridge of Peace (Finished)
Bridge of peace - Erection of barriers
Bridge of peace - Erection of barriers
Bridge of peace - Erection of barriers

Bridge of peace (Before)
Bridge of peace (Before)
Bridge of peace (Before)
Bridge of Peace (Finished)
Bridge of Peace (Finished)
Bridge of Peace (Finished)

Other Recent Jobs

1 Existing wall conditions prior to work commencement
River Wall Repairs Drogheda
05 Mar, 2016
1. Site Conditions During Piling Operations of Works.
Anchor Piles, Shrewsbury Road, Co. Dublin.
05 Mar, 2016
Finished Horserail Fence
Horserail Fence
11 Apr, 2015
Bridge of Peace (Finished)
Bridge Of Peace Drogheda
11 Apr, 2015
Figure 1 - Pipe to be Rammed
Pipe Ramming Shercock Co. Cavan
28 Oct, 2013
Figure 3 - Placement of second pile.
Mini Piling - Drogheda Co. Louth
28 Oct, 2013
PJ Piling Contracts 042 9662281